Food Safety Atlas

HACCP: a worked example

Fictional. Step 11 of 12, Principle 6. Frequencies below are this example's choices, not requirements.

ValidationMonitoringVerification
The questionCan this control work, if done properly?Is it within the right now?Is the plan being followed and working?
WhenBefore the plan starts, and again after a changeDuring production, batch by batchAfter the plan starts, on an ongoing schedule
Who team, with outside expertise as neededThe person doing the workSomeone other than the person who monitors and corrects
Cook, in this example's 75 °C for poultry. Heat trials with a full kettle to find the coolest point.The cook probes 3 places in each batch.The supervisor reviews records and watches a cook.
Cool, in this exampleThe is in law. Timed trials with a full chiller and the deepest pan, on the hottest day, confirm this kitchen can meet it.The cook logs for each batch.The supervisor compares the with the chiller's own record.
Reheat, in this example's 75 °C within 1 hour. Timed trials with a full oven and trays straight from the cool room.The cook logs time out, time reached and the reading.The supervisor reviews records and watches a reheat.
Shelf life, in this example5 days at 5 °C or below follows 's recommendation. Any longer would need evidence.Date label checked daily, sensor record of cool room.Tests on a sample at the end of shelf life, at an laboratory.

says taken from outside guidance still need checking against your own operation and product, and that you should gather evidence in operation that control can be achieved consistently. So a limit found in a law or a guide is a start. It proves the limit is sound. It does not prove your can meet it with 40 kg in it.

Three batches, worst case
New Zealand's template asks for 3 consecutive passing batches when proving a method, and a redesign on any failure. This example uses the same idea for and reheating. Other places may ask for something different.
Thermometers
cl 22 needs a device accurate to ±1 °C. recommends at least every 12 months, with ice and boiling water checks in between. This example checks weekly, and replaces or adjusts any probe more than 1 °C out.
Weekly record review
Someone other than the cook checks the records are complete, match the and have when needed. A perfect, tidy record gets a second look.
Monthly observation
Watch a cook, a cool and a reheat being done and probe alongside. Records show what was written down. Watching shows what is done.
Testing
End-of-shelf-life samples and surface swabs, quarterly in this example, at an laboratory. Testing supports the plan but cannot replace it, because a sample tells you little about the rest of the batch.
Full review each year
asks for a comprehensive review periodically or when things change, such as a reanalysis or audit, confirming all elements still work.
Review triggerExample in this kitchen
Recipe or ingredient changeA new spice blend, a cream base instead of yoghurt, a new
Supplier changeA new chicken or spice supplier
Process or equipment changeNew , bigger kettle, larger batch, vacuum packing, freezing
Shelf life or use changeLonger use-by, eating it cold, delivery, a care facility as a customer
Repeated or serious deviations missed twice in a month
Complaint, illness or failed testA suspected food poisoning report, a result from a swab
New science or lawA change in the Code or regulator guidance, or a affecting a similar product
New site or staff patternA new late shift, a new kitchen layout
Annual reviewEven when nothing appears to have changed. also asks for review where a team concluded no CCPs were needed.